District heating reinvestment

Location: Lidingö, Stockholm

Client: Stockholm Exergi

The project includes the replacement of 1 km of main DN400 pipelines from Drottningvägen to Lidingö Bodal station, as well as service lines along the route.

Termoekonomi was responsible for the design of the district heating pipelines. We performed power calculations in ROHR2 and had Dekra conduct a third-party review. Since other pipelines were also being installed, for example Ellevio building a new power grid, coordination of pipelines was carried out.